CASO DE ÉXITO

Meeting state mandated testing requirements while solving power, maintenance and budget challenges.

 

 

Randolph Central Schools

Aging computers, difficulty managing software deployments and mandatory state testing drive need for change

Randolph Central Schools is a small rural school district faced with a decreasing annual technology budget and increasing technology requirements. To serve its 1,500 students, the school district had traditional computer labs across its campuses with one desktop per workstation comprised of IBM, Dell, or white box, but there were continued challenges with software updates coupled with problems resulting from the aging hardware in excess of seven years old.

The computers were slow and there was no easy way to deploy software on each machine. Randolph Central Schools used scripting, a deployment server and group policy objects to install and update software. From an ongoing support perspective, the district spent most of its IT resources on work requests for break-fix problems in computer labs, software updates and configurations.

To compound matters, Randolph Central Schools needed to increase the number of computers for mandatory state testing, but before doing so it had to address the limitations of the existing environment including power capacity issues within its labs, which were never designed to host so many computers.

Randolph Central Schools

Randolph Central Schools trades PCs for thin clients

The district explored options and considered Citrix and VMware, but ultimately selected NComputing L300 thin client devices because of the overall cost of deployment, which was less than half the cost of traditional computers, as well as the simplicity of design and setup.

Randolph Central Schools was thrilled with the easy installation of the L300’s, and since the devices have very small power requirements there were no concerns over the limited power capacity within existing computer labs and when building new labs. The smaller footprint of the thin client also resulted in a cleaner look at each station with more workspace than before. As far as supporting the new solution, the district’s IT staff experienced immediate timesaving through more efficient desktop management and quicker software deployments.

Randolph Central Schools

“Software installation and updates used to be a time intensive process since scripting from one version of Java to another doesn’t always work. We’d either have to try and get things to work or go to each machine to uninstall and reinstall programs,” said Jonathan Butler, Sr. Network Administrator, Randolph Central Schools. “Things are much more streamlined with the L300’s since everything can be done at the server. What would have taken at least a day previously now takes us less than an hour. When I’m ready to upgrade the Operating system, I’ll only need to upgrade the host. That’s pretty powerful.”

Butler says his team’s productivity has also been increased due to less time required to repair workstations – something that has also drawn praise from teachers who no longer experience the frustration of computer downtime. Randolph Central Schools has saved additional resources by eliminating the need to clean every desktop in the labs since the L300 devices and peripherals don’t have any fans or other moving parts.

NComputing has allowed Randolph Central Schools to expand its computer labs for more general use. By having thin client workstations readily available students can now come in 20 minutes before school starts and do math drills or other educational programs instead of going to the gym as they did previously. “We never had equipment to extend to our faculty and students beyond the existing curriculum,” said Butler. “Now, we have workstations that are fast, easy to log in to and use. Our thin client computers perform extremely well and provide the fastest session you’ve ever used, virtually eliminating any wait time to begin using applications.”

Randolph Central Schools has been very pleased with the ongoing sales and technical support from NComputing, from the sales representative who checks in after each deployment to the tech support team that never left their side during the initial implementation. “They made sure we had the correct settings and adjustments on our host machines,” said Butler. “The comfort level with NComputing is amazing.”

The initial implementation for Randolph Central Schools consisted of 165 L300s and there are plans to deploy more in the future to continue to meet needs across all campuses. The district also hopes to extend NComputing thin client devices beyond computer labs and classrooms to its administrative staff and other areas where there’s currently a traditional desktop computer.

About Randolph Central Schools

Randolph Central School Corporation is the largest public school corporation in Randolph County, Indiana serving the communities of Winchester, Ridgeville, and Saratoga. The district includes one high school, Winchester Community High School; one middle school, Lee L. Driver Middle School; and three elementary schools, Oscar R. Baker Elementary, Willard Elementary School, and Deerfield Elementary School.

Challenges
  • Aging computers in excess of seven years old that were slow and required too much maintenance
  • Difficulty managing computer software installations and updates
  • Power capacity issues in labs, which were never designed to handle so many computers
  • Mandatory state testing that required more computers on a limited budget
Solution
  • NComputing L300 thin client devices
Results
  • Thin client devices that are reliable fast, easy to log in to and use
  • A much more streamlined process for installing software since everything is done at the host server, reducing the time required from a day to less than an hour
  • L300 devices have very small power requirements, so there are no concerns over limited power capacity within computer labs
  • An overall cost of deployment that was less than half the cost of traditional computers

“Things are much more streamlined with the L300’s since everything can be done at the server. What would have taken at least a day previously now takes us less than an hour. When I’m ready to upgrade the Operating System, I’ll only need to upgrade the host. That’s pretty powerful.”

Jonathan Butler

Sr. Network Administrator

Suggested reading

Upgrading Computer Labs to Meet Demands of Curriculum and Online Testing
eLearning comes to the students at 15,493 Government Schools of Gujarat
Reduce the digital divide, expand horizons, and save the Amazon?